What to Know Before Clearing Land Around Tuscumbia
Thorny pear in the pasture. Callery pear takes hold in open fields, unimproved pastures and
along rights-of-way, and its thorns can puncture tires. A stand spreads quickly because birds
carry the fruit. We grind the thicket, then quote a return cut for the sprouts that
rise from the roots a season later. That cut is its own line on the quote, and skipping it lets the stand
rebuild from the same roots.
Limestone, rock and sinkholes. North Alabama sits on limestone that dissolves into caves and
sinkholes. If a depression, an open hole or a wet spot that never dries sits on your acreage, tell us when we
contact you. The machine stays on firm ground, and the quote names any corner we will leave alone.
Permits and the one-acre line. Inside Tuscumbia the Building & Permitting Department is the
office to ask, and outside the city limits it is the county. A regulated construction project that disturbs one acre
or more brings in ADEM's construction stormwater permit, and the notice goes in before any land is disturbed.
Requirements vary by parcel, scope and jurisdiction, and the governing authority makes the determination.