What to Know Before Clearing Land Around Rogersville and Hawkins County
Permits depend on the parcel. Hawkins County issues no building permits and has
no zoning; building permits come through the State of Tennessee, and the Town of Rogersville
keeps a zoning map of its own. Separately, the state's stormwater permit for construction reaches
clearing, grading, filling or excavating one or more acres of land, and the notice goes in
at least 30 days before the ground is disturbed. Ask before a house site is opened up;
requirements vary by parcel, scope and jurisdiction, and the governing authority makes the
determination.
Small fields and ridge feet shape the job. Valley pasture here comes in
small, irregular pieces with wooded ridge close behind, and old fields pull in shrubs and
cedar from the woods on both sides. A field reached by a narrow lane, or sitting on a pitch at a ridge foot, takes the machine
longer than level ground, and the quote shows what that adds.
Burning has a calendar and local rules. Between October 15 and May 15 the
Division of Forestry requires a burn permit on debris piles, and each permit lasts one
day. Rogersville, Church Hill, Mount Carmel, Surgoinsville, Greeneville, Morristown and
Kingsport have burn rules of their own. A mulched field edge leaves no pile to permit, tend
or haul. Our crew grinds the autumn olive, while treating the crowns is left to a licensed applicator.