What to Know Before Clearing Land Around Columbia Township
Lake lots and the 500-foot line. A soil erosion permit is typically required for any project within 500 feet of a lake or stream, whatever its size, or one acre or more of
earth disturbance. In Jackson County those permits come from the county's SESC program at 120 West
Michigan in Jackson. On a lot that runs down to the water, ask that office before stumps are pulled
or ground is reshaped.
Rolling ground and wet low edges. Kettle lakes sit in hollows, so lots tilt toward
the water and the low margins stay damp. That changes when the machine goes in: a soft shore edge is
worked on firm or frozen ground, and a strip too steep or wet to work safely stays out of the job.
Burning near the village. State air rules keep fires of trees, brush and stumps
more than 1,400 feet from an incorporated village's boundary, and in the southern Lower Peninsula
burn permits come from the local fire department or local government. Brooklyn is an incorporated
village in the middle of the township. Requirements vary by parcel, scope and jurisdiction, and the governing authority makes the
determination.