What to Know Before Clearing Land Around Gypsum
Russian olive does not stay cut. Cut or ground down, it sends up shoots from the stump and
the roots. That makes a Russian olive bottom a job in several visits, while brush and conifer on dry
ground is usually finished sooner, and it is why the two kinds of ground price differently. The
Russian olive removal guide sets out the order.
Ask the right office first. Inside the Town of Gypsum, Community Development at 50 Lundgren
Boulevard handles planning and building permits. On unincorporated land, Eagle County Engineering issues
grading permits for soil disturbance, grading, excavation and earthwork, and a floodplain development
permit for development in a designated floodplain, which matters on river-bottom ground. Land in Garfield
or Pitkin County answers to that county's own offices. Requirements vary by parcel, scope and
jurisdiction, and the governing authority makes the determination.
Burning is a separate permit, and the county can restrict it. Eagle County issues open
burning permits, and the Eagle County Sheriff sets fire restrictions together with the Forest Service, the
Bureau of Land Management and local fire departments. Check whether restrictions are in force before any
pile is lit. Brush ground in place leaves no pile, so it needs no burn day.