What to Know Before Clearing Land Around Rocky Mount
Old fields at every stage. A Piedmont field left alone is mostly broomsedge by its
third year. After about five years, eastern redcedar, pine seedlings and blackberry move in, and in
time the pines and cedars shade out the grass and the field turns to young woods. Grass is a brush hog
job, cedar and briar is understory clearing, and young pine is forestry mulching, priced that way.
The lake contour. On Smith Mountain Lake, land below the 800-foot elevation contour
sits inside the Smith Mountain Project boundary. Removing vegetation half an inch in diameter or larger
there needs a Vegetation Removal Permit from Appalachian Power. Above the contour the land is outside the
Project boundary, though the county's land disturbance rules still apply, so on a lake lot the clearing
line is set at the contour unless the permit is in hand.
Offices and permits. Inside the town limits, the Town of Rocky Mount's Planning and
Zoning office issues zoning permits and reviews site plans and plats. Franklin County's Planning and
Community Development office runs the erosion and sediment control program: land disturbance of 10,000
square feet or more needs a permit, and so does 3,000 square feet or more within 200 feet of surface
water, which can reach creek and lake parcels. What applies to your parcel depends on its scope and
location, and the office with jurisdiction decides.