What to Know Before Clearing Land Around Beaumont
Wet swales set the calendar. The flatwoods hold water above a tight layer of
subsoil. A lot that carries a machine in a dry month can swallow it after a week of Gulf rain.
Tracks spread the load, but ruts in a soaked swale hurt the roots of the oaks you want to keep and
leave puddles that last. So the quote names the wet corners and plans to reach them last or in a
dry spell. The
guide to clearing
wet wooded lots around Beaumont walks through it.
Three offices can have a say. Inside Beaumont, the city's flood damage prevention
article requires a development permit in mapped flood hazard areas. Filling, grading and digging
count as development, and fines run up to $500 for each day a violation goes on. Outside the city,
Jefferson County Environmental Control wants a call before any development to land. Drainage
District No. 6 reviews drainage for subdivisions and developments, and new hard surface over a
quarter acre must not add to runoff. Requirements vary by parcel, scope and jurisdiction, and the
governing authority makes the determination. The
Beaumont and
Jefferson County permit guide has the details.
Storms leave a second kind of job. After Hurricane Rita in 2005, 771,000 acres of timber in Southeast Texas were damaged or affected, worst in Orange,
eastern Hardin and southern Jasper counties. A tree counted as damaged if it was uprooted, snapped,
leaning past 45 degrees or likely to die within a year. Leaning and hung trees are a different
hazard from brush, so they are priced separately. Whatever comes down stays out of the ditches:
branches dumped in a drainage ditch break state law.